#1 Home Improvement Retailer
Skip to collection list Skip to video grid
Video Player is loading.
Current Time 0:00
Duration 4:38
Loaded: 0%
Stream Type LIVE
Remaining Time 4:38
 
1x
    • Chapters
    • descriptions off, selected
    • en (Main), selected
    Flooring

    Preparing Your Subfloor for Tile - Step 3: Attach Backerboard

    Step 3 of preparing your wood subfloor for tile is installing cement-based backerboard. Apply polymer-modified thinset to the subfloor, install the backerboard, and screw into place. Allow one day for the thinset to dry.

    Currently loaded videos are 31 through 33 of 33 total videos.

    Load Previous Page
    Last page loaded, no next page available